Aliceville Pool Near AL ST Hwy 17 Bridge Crossing (River Mile 292.7)

Notice Number: 23-82 Date: 11/27/2023 from 0800 to 1800 Brightspeed Communications will be working on overhead fiber optic cables just north of the Alabama State Highway 17 Bridge at river mile 292.7. The work will take place on Monday, November 27, 2023, from 0800 to approximately 1800. Mariners are urged to exercise caution when transiting…

Read More

Black Warrior Tombigbee-Tennessee River Water Levels

Notice Number: 23-81 Date: UNTIL FURTHER NOTICE Notice is given to mariners that due to water levels, a strict maximum draft for the Black Warrior Tombigbee Waterway is set at 9ft. For further information, please contact Chad Brumelow at the BWT/ Alabama-Coosa Project Management Office (CESAM-OP-BA) at (205) 612-3493. //signed// ASHLEY N. KLEINSCHRODT Chief, Navigation…

Read More

Stream Bank Protection Kanawha River, Mile 37.3

Notice Number: 205422/23-31  Date: 11/27/2023 11:30 thru 12/15/2023 21:30 Notice is given that on or about 27 November 2023, Amherst Madison, Inc. will begin placing stream bank protection for residents of Nautical Point, along the left descending bank of the Kanawha River, mile 37.3. The contractor’s floating plant will consist of the M/V MILTON, one…

Read More

Shoaling Reports: Mobile Harbor

Notice Number: 23-79 Date: 11/8/2023 Notice is given to mariners that the shoal south of buoy’s nine and ten, between stations 2063+00 – 2066+00, on the Mobile Bar Channel has been removed and the draft restriction has been lifted. For further information, please contact the U.S. Army Corps of Engineers, Irvington Site Office at (251)…

Read More

Intake Screen Installation, Big Sandy River, Mile 6.0

Notice Number: 205283/23-30 Date: 10/30/2023 11:00 thru 11/30/2023 22:00 Notice is given that on or about 30 October 2023, Superior Marine Inc., contractor for Calgon Carbon LLC, will begin water intake screen installation along the left descending bank of the Big Sandy River, Mile 6.0. The contractor’s floating plant will consist of the M/V MORGAN…

Read More

Shoaling Reports: Mobile Harbor, Alabama

Notice is given to mariners that there is a shoal south of buoy’s nine and ten between stations 2063+00 – 2066+00 on the Mobile Bar Channel. A draft restriction of 43 feet is recommended. A maintenance dredge will be onsite within seven days to perform dredging operations. Material will be placed in the offshore disposal…

Read More

Low Flows at Pickwick Locks Tennessee River Mile 206.7

Notice Number:23-44 Date: 10/26/2023 Due to the low river flows and Kentucky being a winter pool, until further notice, the tailwater at Pickwick Dam on Tennessee River mile 206.7 is dropping below minimum elevation of 355 when TVA is generating only one unit overnight. The River Forecast Center plans to provide a minimum of two…

Read More

TVA TRANSMISSION LINE REPAIRS

Notice Number: 23-43 Date: 10/23/2023 thru 10/31/2023 TVA will be performing work on the transmission lines just below Wheeler Dam starting October 23, 2023, and could last up to eight days. Work will take place daily from 0630-1800. There will be four boats in the water approximately 0.5 miles below the line. Three boats will…

Read More