IDOT CN68B446 – McClugage Bridge Project – Arch Float-in – 3-Week Prior to Operation
All,
As discussed during the IRCA Meeting on November 14th, we are on track for December 19th and 20th for the Navigation Channel Closure for the Arch Float-in at the McClugage Bridge Project. Attached for reference are the documents that were reviewed during the Nov. 14th IRCA Meeting.
As noted in the Detailed Schedule document, I’ll provide updates on a weekly basis over the next couple weeks, and then daily updates a week prior to the operation.
If I missed anyone on this distribution, please let me know and I’ll include them on the next update.
If you have any questions or comments about this please don’t hesitate to reach out.
Float-in Operation - Detailed Schedule
Arch Float-In - Sequence of Work
Thanks,
Pat Ryan, P.E.
Project Manager
American Bridge Company
pryan@americanbridge.net
M (816) 518-6950
2 News Plaza, Peoria, IL 61614
www.americanbridge.net